COPPER 31APPLICATION GUIDE

For industrial drilling thread connections

Protect threaded connections. Get consistent coverage.

Copper 31 is an industrial drilling thread compound. Proper preparation and application help reduce connection wear and galling of the drill stem.

Before You Start

Confirm the Application

For approved industrial drilling connections only. Check connection instructions, torque requirements and the +15°F published minimum.

Protect Yourself & Your Work

Outdoor use only per SDS. Wear chemical-resistant gloves and safety goggles; use a clean compound brush and keep dirt out of the pail.

4 Simple Steps

  1. Clean & Inspect the Connection

    Remove old compound, drilling fluid and debris from the threads and contact surfaces. Check for damage before applying fresh compound.

  2. Prepare the Compound

    Stir with a clean compound brush if any oil or solids have separated. Never dilute with oil, diesel or other materials.

  3. Brush on an Even Coat

    Cover the specified threads and shoulders uniformly, working compound into the thread roots. Avoid missed areas and heavy globs.

  4. Assemble to the Correct Torque

    Align and make up the connection using its manufacturer’s procedure and required specific torque. Remove excess material.

MERRILL COPPER 31

Merrill Copper 31 industrial drilling thread compound pail
Available in 1-, 2- and 5-gallon containers

Draft - technical review before publishing