Wall Faucet
Installation Guide
For Merrill frost-proof & anti-siphon wall faucets
For MAP PEX, MAD sweat/threaded and MAT dual-threaded models | Choose the correct connection and wall length.
Before you start
Check the location & length
The shutoff end must extend inside a heated space, beyond exterior insulation. Verify wall thickness, access and plumbing connection.
Get ready to install
Shut off water, relieve pressure and identify the supply pipe. Have correct fittings, fasteners, supports and sealing materials.
5 simple steps
Shut off & choose the right faucet
Close the upstream water supply and drain the line. Select a faucet long enough to place its shutoff end in a heated indoor area.
Drill & pitch toward the outside
Mark an opening with access to the indoor supply. Position the inlet HIGHER than the outdoor spout so the barrel drains.
Insert & secure the faucet
Pass it through the wall without bending the tube. Fasten the outdoor flange to solid backing; seal the wall penetration.
Connect the indoor water line
Use the MAP, MAD or MAT connection instructions in this guide. Support the supply line; prevent twisting or overheating the faucet.
Restore water & test drain-down
Slowly pressurize and check for leaks inside and outside. Shut the faucet, remove any hose/nozzle and confirm water drains.
Danger — Pressurized water / hot-work hazardShut off water, drain and confirm zero pressure before cutting. Protect nearby combustibles and valve components during sweat soldering; hire a qualified plumber if needed.
Important — Merrill warranty warningInstall with the inlet higher than the outdoor outlet for drain-down. Remove hoses and closed-end attachments after use, especially before freezing. Follow local codes and the exact model instructions.



